Switch Datacenters WAW1 is in Mory, Warsaw area in Poland, it is a 50 MW IT power-dense development. Construction is expected to start in 2027 with the first phase of 22 MW IT load.
WAW1 is a power efficient site using our modular design of high-density power distribution and dry cooling, meaning no water is used for cooling operation facilitating flexible cooling options – liquid, air, or a hybrid combination – tailored to the latest AI specifications. The design has both low PUE & WUE, is designed for green heat reuse.
Switch Datacenters will secure local renewable energy for the location with the aim of 100% renewable energy through new additional projects, unique for Poland.
Current high level design specs
WAW1 Specifications
Design up to 50 MW IT load
The facility is designed with the following modern power technologies to meet the highest datacenter requirements:
- Utility Feeders first phase 90 MVA
- Total IT load: 50 MVA
- Energy supply: 100% Renewable
- Heat Reuse: Green heat re-use project under development
Current high level design specs assumptions:
| Total Surface | 46.529 m² |
| White space | 8.500 m² (10 halls, phase 1) |