Under Development: AMS7

Switch Datacenters Amsterdam 7 (AMS7) - Wholesale AI powerdense and sustainable datacenter located near Schiphol

Introducing our wholesale AI powerdense and sustainable datacenter

AMS7 site

Switch Datacenters AMS7 is part of our triangle of new 100 MW + power-dense developments together with our AMS5 and AMS7 datacenters and is uniquely located in the Schiphol area. Construction is expected to start in 2027 and will bring a modular build of 60MW initially with expansions building up to a total of 120 MW in 2030.

The datacenter will have a BESS system on site, fed with renewable power from a large local solar plant and Dutch wind.

It is a power efficient site using our modular design of high-density power distribution and a hybrid combination of dry and air cooling facilitating flexible cooling options (liquid, air, hybrid), tailored to the latest AI specifications. The design has both low PUE & WUE and operates on 100% renewable energy.

Current high level design specs

AMS7 Specifications

Design up to 120 MW IT load

The facility is designed with the following modern power technologies to meet the highest datacenter requirements:

Connectivity available major carriers (e.g. Eurofiber, EU networks). Direct connections via 2 separate routes to the Amsterdam fiber ring & major IXs. Special carrier connectivity can bearranged.

Current high level design specs assumptions:

Total Surface 56,980 m²
 White space 21,600 m² (18 halls)
Start construction
2011
Load, design up to
0 MW
Total Surface
0
Incoming grid capacity
0 MVA

Send us a message

Contact us

Want to know more about AMS7 Datacenter?

AMS7 Brochure

Want to know more about AMS7 Datacenter?

AMS7 Brochure