Under Development: AMS7
Switch Datacenters Amsterdam 7 (AMS7) - Wholesale AI powerdense and sustainable datacenter located near Schiphol
Introducing our wholesale AI powerdense and sustainable datacenter
AMS7 site
Switch Datacenters AMS7 is part of our triangle of new 100 MW + power-dense developments together with our AMS5 and AMS7 datacenters and is uniquely located in the Schiphol area. Construction is expected to start in 2027 and will bring a modular build of 60MW initially with expansions building up to a total of 120 MW in 2030.
The datacenter will have a BESS system on site, fed with renewable power from a large local solar plant and Dutch wind.
It is a power efficient site using our modular design of high-density power distribution and a hybrid combination of dry and air cooling facilitating flexible cooling options (liquid, air, hybrid), tailored to the latest AI specifications. The design has both low PUE & WUE and operates on 100% renewable energy.
Current high level design specs
AMS7 Specifications
Design up to 120 MW IT load
The facility is designed with the following modern power technologies to meet the highest datacenter requirements:
- Utility Feeders: 80MVA
- Total IT load: 60 MW --> 120 MW (pending ph2)
- Energy supply: 100% Renewable
- Heat Reuse: Green heat re-use project under development
- Battery park: BESS system on site
Connectivity available major carriers (e.g. Eurofiber, EU networks). Direct connections via 2 separate routes to the Amsterdam fiber ring & major IXs. Special carrier connectivity can bearranged.
Current high level design specs assumptions:
| Total Surface | 56,980 m² |
| White space | 21,600 m² (18 halls) |
- Complimentary car parking within the gates
- Man trap single entry (Can be tailored to single tenant specs)
- Entry: 24/7 on-site security officers
- Physical: Card readers, biometric readers
- People: Fingerprint, CCTV, surveillance,
- Electronic: Motion detection